> ## Content Index
> Fetch the complete content index at: https://www.bunchgrass.org/llms.txt
> Use this file to discover other available public pages before exploring further.

# Missouri Slope road work: Nov. 20 to 29: Morrison Avenue closed near Bismarck airport
- URL: https://www.bunchgrass.org/missouri-slope-road-work-nov-20-to-29-morrison-avenue-closed-near-bismarck-airport/
- Published: 2026-11-20T15:40:35.000Z
- Updated: 2026-11-20T15:40:35.000Z
- Description: Morrison Avenue near the Bismarck airport is closed through Nov. 27, westbound Main Avenue is down to one lane, and Tyler Parkway at Cogburn Road stays closed. First Street NW in downtown Mandan is set to finish Nov. 25.
- Author: Bunchgrass Staff
- Tags: Missouri Slope, #road-work

*Friday, Nov. 20, through Sunday, Nov. 29, 2026*

Morrison Avenue in south Bismarck is closed near the airport through Friday, Nov. 27, while crews repair a blowout, with Burlington Drive and Airway Avenue as the way around. Westbound Main Avenue is down to one lane for a water connection repair through the same day, and the Tyler Parkway and Cogburn Road intersection in northwest Bismarck stays closed with its detour also listed through Nov. 27\. In downtown Mandan, First Street NW is set to finish Wednesday, Nov. 25.

## Mandan and Morton County

### First Street NW, downtown Mandan

First Street NW, between Sixth and Fourth avenues NW, remains under construction, with Main Street as the primary detour and Second Street as the secondary one, according to the city's [Nov. 2 project newsletter](https://www.cityofmandan.com/vertical/sites/%7B38C3EFDC-F4D8-4D02-9E13-0987A081A7A4%7D/uploads/MandanDowntownSID236-Week%5Fof%5FNov%5F2%5F2026%5F-%5FREV%5F2.pdf?ref=bunchgrass.org). That newsletter, still the newest on the [city's projects page](https://www.cityofmandan.com/projects?ref=bunchgrass.org), set completion for Wednesday, Nov. 25, so the street could reopen this week. The city has not posted a newer date.

### Memorial Highway and Main Street, Mandan

Memorial Highway has no new traffic changes posted. The [Nov. 3 NDDOT notice](https://www.dot.nd.gov/news/double-left-turns-coming-main-street-and-memorial-highwaymandan-avenue-five-lanes-stay-open?ref=bunchgrass.org) put two left-turn lanes at Main Street and Memorial Highway/Mandan Avenue and said five lanes would stay open through the winter. The [Oct. 23 project newsletter](https://content.govdelivery.com/accounts/NDDOT/bulletins/4304622?ref=bunchgrass.org) says stormwater work near 3rd Street SE continues through November and is not expected to affect traffic. Questions go to the project hotline, 701-667-1033, or the [city's project page](https://www.cityofmandan.com/mhp?ref=bunchgrass.org).

### N.D. Highway 1806 bridges north of Cannonball

- Cannonball River Bridge, near the Sioux County line: shoulder closed with reduced speeds and intermittent lane closures, listed through Friday, Nov. 27, on [ND Roads](https://travel.dot.nd.gov/?ref=bunchgrass.org). That listing ends this week.
- Cantapeta Creek Bridge, just north: traffic is on the new bridge, with intermittent daytime lane closures while crews remove the temporary bypass, reduced speeds and a 14-foot width limit, listed through Friday, Dec. 18, on [ND Roads](https://travel.dot.nd.gov/?ref=bunchgrass.org). No change from last week.

Done: N.D. Highway 49 just east of Glen Ullin closed Wednesday, Nov. 18, from 8 a.m. to about 5 p.m. for BNSF railroad work, with a signed detour, [NDDOT said](https://www.dot.nd.gov/news/nd-49-near-glen-ullin-close-wednesday-railroad-work?ref=bunchgrass.org).

## Bismarck, Lincoln and Burleigh County

### Morrison Avenue near the airport

Morrison Avenue, marked on the city's [closure map](https://bismarck.maps.arcgis.com/apps/mapviewer/index.html?webmap=c5057d147641489fa6c94e1b3d3b95e6&ref=bunchgrass.org) near Airway Avenue north of Bismarck Municipal Airport, is closed to repair a blowout area. New since last week, the closure is listed Wednesday, Nov. 18, through Friday, Nov. 27\. The alternate route is Burlington Drive, Airway Avenue and Morrison Avenue, and the map shows a detour route for the same dates.

### Bismarck streets

- Main Avenue near Airport Road: new since last week, westbound Main Avenue is reduced to one lane for a water connection repair, listed Tuesday, Nov. 17, through Friday, Nov. 27, on the closure map. The same spot carries a lane restriction for intersection signal and underground work, listed Aug. 24 through Friday, Dec. 4\. The city's Nov. 3 notice about running the intersection as an all-way stop for about two weeks while new signal poles went in has been archived, and no newer notice is posted.
- Century Avenue near Century High School: new since last week, westbound is reduced to one lane, and the median is closed at the school's west driveway. A separate listing reduces eastbound Century Avenue to one lane temporarily, with no location given. Both are listed Monday, Nov. 16, through Sunday, Nov. 22, on the closure map.
- Tyler Parkway and Cogburn Road: the intersection remains closed, with Frisco Way as the alternate route, listed Aug. 28 through Friday, Nov. 27, on the closure map.
- 5th Street and Front Avenue: the all-way stop trial that began Oct. 27 continues, [the city said](https://www.bismarcknd.gov/CivicAlerts.aspx?aid=9100&ref=bunchgrass.org), and the closure map lists it through May 31, 2027.

### 132nd Street NE bridge

The bridge on 132nd Street NE, about 1 3/4 miles north of 201st Avenue NE, remains restricted to 7 tons gross vehicle weight and 12 feet wide until further notice, the [county said](https://www.burleigh.gov/news/posts/bridge%5Frestriction%5F132nd%5Fst%5Fne/?ref=bunchgrass.org) in February.

Done: In Bismarck, the westbound lane restriction on East Bismarck Expressway near Railroad Avenue, listed through Nov. 20, and the Century Avenue and 19th Street lane shift, listed through Nov. 13, are no longer on the closure map. Apple Creek Road east of Bismarck has been open since Nov. 11.

Later: The Main Avenue and Airport Road signal work is listed through Dec. 4, and the Cantapeta Creek Bridge work on N.D. 1806 through Dec. 18\. Memorial Highway work resumes in 2027, rebuilding the stretch from Riverwood Avenue SE to 32nd Avenue SE, according to [NDDOT](https://www.dot.nd.gov/memorialhwy?ref=bunchgrass.org). Mandan lists an 8th Avenue and 27th Street NW reconstruction for 2027 on its [projects page](https://www.cityofmandan.com/projects?ref=bunchgrass.org).

For live state highway and interstate conditions, check [ND Roads](https://travel.dot.nd.gov/?ref=bunchgrass.org) or call 511\. For city streets and county roads, check with the City of Bismarck and its [closure map](https://bismarck.maps.arcgis.com/apps/mapviewer/index.html?webmap=c5057d147641489fa6c94e1b3d3b95e6&ref=bunchgrass.org), the [City of Mandan](https://www.cityofmandan.com/projects?ref=bunchgrass.org), the [Burleigh County Highway Department](https://www.burleigh.gov/departments/highway-department/?ref=bunchgrass.org) or the Morton County Highway Department at 701-667-3346.