> ## Content Index
> Fetch the complete content index at: https://www.bunchgrass.org/llms.txt
> Use this file to discover other available public pages before exploring further.

# Black Hills road work: Nov. 20 to 29: Sioux and St. Patrick intersection closed
- URL: https://www.bunchgrass.org/black-hills-road-work-nov-20-to-29-sioux-and-st-patrick-intersection-closed/
- Published: 2026-11-20T15:40:42.000Z
- Updated: 2026-11-20T15:40:42.000Z
- Description: U.S. 16A stays closed in Keystone, I-90 is one lane each way at Piedmont, and Rapid City closes the Sioux Avenue and East Saint Patrick Street intersection through Dec. 1.
- Author: Bunchgrass Staff
- Tags: Black Hills, #road-work

*Friday, Nov. 20, through Sunday, Nov. 29, 2026*

U.S. Highway 16A remains closed in Keystone, and Interstate 90 is still one lane each way between Piedmont and Summerset. In Rapid City, the Sioux Avenue and East Saint Patrick Street intersection is closed through Dec. 1, and several long-running street closures are due to wrap up Friday.

## Interstate 90

I-90 between Exit 17 (U.S. 85 south) and Whitewood, Exit 23, remains one lane with a 65 mph limit and a 16-foot width limit until further notice for slope flattening, guardrail removal and a box culvert extension, per [SD 511](https://www.sd511.org/?ref=bunchgrass.org).

I-90 from 1 mile west of Piedmont, Exit 44, to just west of Summerset, Exit 48, remains one lane in each direction until further notice for the Exit 46 rebuild, with a 65 mph limit and 45 mph when workers are present, per [SD 511](https://www.sd511.org/?ref=bunchgrass.org). The 16-foot width limit listed last week no longer appears.

Westbound I-90 east of Wasta and east of Wall: the two pavement repair zones that cut traffic to one lane last week are no longer listed on [SD 511](https://www.sd511.org/?ref=bunchgrass.org).

## Rapid City and Pennington County

U.S. Highway 16A in Keystone remains closed at the S.D. Highway 40 intersection for a bridge replacement, with a detour, a 12-foot width limit and a 50-foot length limit until further notice, per [SD 511](https://www.sd511.org/?ref=bunchgrass.org). This month crews are finishing the second retaining wall and starting the floor of the new box culvert, according to SDDOT's [project page](https://dot.sd.gov/construction-projects/rapid-city-region/custer-area/us-highway-16a-in-keystone/?ref=bunchgrass.org).

Rapid City streets, from the city's [road construction page](https://www.rcgov.org/departments/public-works/engineering-services/rapid-city-road-closures-382.html?ref=bunchgrass.org) (end dates are estimates):

- Sioux Avenue and East Saint Patrick Street: the intersection is closed for demolition and concrete paving, along with the outside lane of East Saint Patrick Street and the north sidewalk, through Tuesday, Dec. 1\. Closed now.
- Due to end Friday, Nov. 20: South Street closed from 12th Street to West Boulevard; East Saint Charles Street closed from Sioux Avenue to Riley Avenue and Sioux Avenue closed from East Saint Patrick to East Franklin Street; and the Saint Joseph Street north sidewalk between Fourth and Fifth streets, with pedestrians sent to the south side.
- Elm Avenue and Fairmont Boulevard: the intersection remains closed, with work moving to Maple Avenue, through Thursday, Nov. 26.
- Elmhurst Drive remains closed to through traffic from Canyon Lake Drive to Minnekahta Drive through Friday, Nov. 27.
- Viking Drive remains closed at Haines Avenue for sewer repair, with a detour to Bengal Drive, through Monday, Nov. 30.
- Canyon Lake Drive has one lane closed from Clifton Street to Minnekahta Drive through Monday, Nov. 30.
- Corral Drive still has its inside lane and the inside turn lane from Sheridan Lake Road closed; the posted estimate of Tuesday, Nov. 17, has passed.
- Later in December: Post 320 sidewalks along Canyon Lake Drive and Sheridan Lake Road, closed to walkers and cyclists (Tuesday, Dec. 1), and the Cherry Avenue and East Saint Charles Street intersection, including the turn lane from East Saint Joseph Street (Tuesday, Dec. 22).

## Spearfish, Deadwood, Lead and Lawrence County

North Avenue in Spearfish, at I-90 Exit 10, remains one lane each way with a 35 mph limit, no passing and a 16-foot width limit until further notice, per [SD 511](https://www.sd511.org/?ref=bunchgrass.org). SDDOT's [Nov. 5 notice](https://dot.sd.gov/inside-sddot/media/press-releases/spearfish-exit-10-intersection-project-on-interstate-90-begins-final-phase-of-northern-median-construction/?ref=bunchgrass.org) set Friday, Nov. 20, as the project completion date. Until the new northbound left turn on North Avenue is built, left turns from Old Highway 14 and northbound left turns from North Avenue onto Old Highway 14 are prohibited; SDDOT suggests Exit 8, and all I-90 ramps stay open. Engineer Zach Kuhn, 605-892-2872.

U.S. Highway 14A at Cheyenne Crossing, from the U.S. 85 junction to a half mile east, is still one lane under temporary signals for the Ice Box Creek culvert replacement, with delays of about 10 minutes and a 12-foot width limit until further notice. [SD 511](https://www.sd511.org/?ref=bunchgrass.org) still says two lanes should return by November.

## Custer, Hill City and Custer County

S.D. Highway 87 in Custer State Park, from three-quarters to a half mile south of the west junction with U.S. 16A, has flaggers, a pilot car, one lane, no passing and delays of about 15 minutes daily from 7 a.m. to 6 p.m. until further notice for curve realignment clearing, per [SD 511](https://www.sd511.org/?ref=bunchgrass.org). The listed hours moved an hour later than last week. SDDOT's [Nov. 2 notice](https://dot.sd.gov/inside-sddot/media/press-releases/grading-projects-scheduled-to-begin-on-us-highway-16a-and-sd-highway-87-near-custer/?ref=bunchgrass.org) also announced a second curve project on U.S. 16A, about a half mile south of S. Playhouse Road, with flaggers and a pilot car during working hours and both roads open evenings; that one is not listed on SD 511 this week. Engineer Montana Rivard, 605-981-5089.

## Hot Springs and Fall River County

U.S. Highway 385 in Hot Springs, where a city bridge project had shifted lanes and limited width to 12 feet, and northbound S.D. Highway 79 north of Hot Springs, where pavement repair cut traffic to one lane, are no longer listed on [SD 511](https://www.sd511.org/?ref=bunchgrass.org).

Done in Rapid City: Valley Drive, closed past Eagle Drive Nov. 17 to 19 for a Rapid Valley Sanitary District water main; Jackson Boulevard; and the eastbound West Main Street lane near Mountain View Road, which no longer appears on the city's page.

Later: written comments on SDDOT's [proposed I-90 reconstruction](https://dot.sd.gov/inside-sddot/media/press-releases/sddot-seeks-public-input-for-proposed-interstate-90-reconstruction-projects-west-of-wasta/?ref=bunchgrass.org) from two miles east of New Underwood to four miles west of Wasta, including removal of the Exit 88 ramps, are due Tuesday, Dec. 8\. Rapid City is taking written comments on the revised Chapel Lane Bridge replacement design through Dec. 2, [KOTA reported Nov. 16](https://www.kotatv.com/2026/11/16/black-hills-bottlenecks-upcoming-construction-winter-travel-updates/?ref=bunchgrass.org); questions go to Matthew Robinson of HDR Engineering, 605-977-7772\. New signals at the eastbound Exit 10 off-ramp in Spearfish are expected in January 2027, and U.S. 16A in Keystone is scheduled to reopen by April 23, 2027.

Holiday travelers heading out for Thanksgiving can check live conditions at [sd511.org](https://www.sd511.org/?ref=bunchgrass.org) or by dialing 511, and for local streets, check with your city or county.